Product code: 61-252
The element connecting gutters at building corners, enables to fit gutter system to roof shape. Glued with angle given by customer.
| EAN |
5900805022335 |
| Product code |
61-252 |
| Gutter system elements |
Inner corner |
| Angle |
Any angle |
| RAL colour |
RAL 8017 |
| System colour |
Brown |
| System type |
PVC |
| Pipe system size |
63 mm, 90 mm |
| Gutter system size |
100 mm |
| System |
Gutters |
System specification
1An innovative product simplifying the assembly of gutter systems on non-standard roofs. It facilitates the assembly process, does not require gluing, eliminates the need for welding the corners.
Scheme of the system
1ROOF GUTTER
2GUTTER HANGER
3INNER CORNER **
4GUTTER JOINT
5OUTER CORNER ***
6DROP OUTLET
7END CAP (LEFT, RIGHT)
8DOWN PIPE
9T-PIPE
10DOWN PIPE CLAMPING RING
11DOWN PIPE JOINT
12REDUCTION ADAPTER
13RAINWATER RECLAIMER
14ELBOW
15CLEAN-OUT
16SEDIMENT TRAP ((BROWN, GRAPHITE, GREY, BLACK)
17DOWN PIPE CLAMPING RING - METAL
18METAL GUTTER BRACKET (STRAIGHT, TWISTED, ADJUSTABLE)
19FASCIA BRACKET (STRAIGHT, TWISTED)
20CLAMP HOOK / STABILISING FAÇADE FLANGE / DOWN PIPE CLAMP FASTENER FOR COMPOSITE PANELS
Installation instructions
1
When choosing a gutter system, calculate the so-called Effective Roof Area using the formula: EPD = (A+B/2) x C A – horizontal distance from corner to ridge [m] B – roof height (m) C – roof length (m) Minimum installation temperature – 0°C
2
Correct installation of a PVC gutter system is a guarantee of its long- term durability and reliability, even in difficult weather conditions. In comparison with traditional solutions, the main advantage of the
construction is the ability to compensate for thermal changes in the length of its individual elements. This is achieved thanks to the appropriate design of gutter and pipe joints. In gutters, it is implemented through a slidable connection with gutter joints equipped with flexible gaskets, and in downpipes, through assembly slack at the connections with pipe joints. Moreover, elements that fasten the gutter system to the roof and building walls, such as gutter hangers
and down pipe clamping rings, not only stabilize the system but also allow compensation for variations in its length. If gutters are fitted to gutter strips made of galvanised metal sheet, they must be painted or coated. The gutters under the eaves should be installed below the line which is an extension of the roof surface, so that they are not subjected to sliding snow loads.
3
Correct installation must protect gutters against the impact of snow sliding down a roof. The upper edge of gutter flanging should not protrude over the extension of the roof surface, which is represented in the picture.
4
Cut the gutter into suitable length, at the right angle, with a fine-toothed saw.
5
PVC hangers with straight or twisted fascia boards, as well as straight or twisted steel hangers are mounted directly to the laths or rafters. The distance between the hangers should be 40–50 cm. In order to drain water properly, gutters should have a decline in the
direction of the drop outlet of min. 2 mm per 1 m.
6
The first step in the system installation process is to locate an outlet drop, i.e. the lowest element of the system roof section.
7
At first, mount the hanger located farthest from the drop outlet, and then the hanger next to the drop outlet. Extend two strings between the hangers and establish the correct decline of the gutter. PVC hangers
are mounted directly to the face board.
8
In PVC and metal hangers, the installation process should begin with putting the pipe flanging into the front nose of the hanger and then forcing in the internal part of the gutter under the rear nose.
9
A corner, drop outlet and gutter joint should be mounted together by inserting onto the front gutter flanging and latching on the rear gutter flanging. Gutter ends should be situated around 5 mm in front of the limiters.
10
Installation of the end cap should start from inserting it into the front gutter flanging and latching it on the rear gutter flanging. Pay attention to the correct position of the gaskets.
11
Clamping rings are fixed to a wall using clamp hooks of correct length. If necessary, an additional supporting façade flange is used. Clamping rings on down pipes should be spaced at least every 2–2.5 m.
12
A corner, drop outlet and gutter joint should be mounted together by inser ting onto the front gutter flanging and latching on the rear gutter flanging. Gutter ends should be situated around 5 mm in front of the limiters. While connecting, pay attention to
a correct position of gaskets located in drop outlets, joints and corners, as well as to the limiters located on internal sur faces of these elements. We also recommend mounting additional gutter hangers on the gutter-gutter joint and gutter- drop outlet
connections.
13
Connect down pipes with drop outlets, elbows and gutter joints using the push-fit system. In case the eaves protrude over 10 cm beyond the wall, the set-off should be extended by a section of a down pipe. Mount the elements in the following order: pipe elbow, pipe, pipe elbow and down pipe. Leave a 10 mm clearance to compensate for thermal expansion of the pipe.
14
Connect down pipes using the push-fit system. Leave a 10 mm clearance in a joint socket to compensate for thermal expansion of the pipe.
15
We recommend that a reclaimer should be installed in locations not subjected to serious pollution (e.g. tree leaves). In case the reclaimer cleaning is necessary, it should be flushed several times with pressurised water
16
A clean-out should be mounted on the lower down pipe section when a gutter system is to be connected to a sewer system. Each clean-out comes with a strainer collecting impurities from a gutter. The whole is closed with a tight lid. The passage between a 110 mm diameter clean-out and a 90 mm diameter pipe may be connected using a reduction adapter.
17
A sediment trap should be installed in the ground. It must be flushed with the final soil layer. In order to provide the necessary stability, pour concrete on an excavation bottom and connect the sewage system piping. After the final soil level is established, pour
another layer of concrete around the sediment trap. Next, connect a down pipe.