Cellfast Group Download: product catalogue Zadzwoń: tel. 13 437 47 52
en
  • Polish Polski
  • German Deutsch
  • Hungarian Magyar
  • Czech Čeština
  • Products

    Bryza Steel Gutter Systems

    Features Specification System diagram System elements Installation instructions

    Bryza PVC Gutter Systems

    Features Specification System diagram System elements Installation instructions

    Soffits Bryza PVC

    Features System elements Installation instructions
  • About us
  • Download
  • Contact

Menu

en
  • Polish Polski
  • German Deutsch
  • Hungarian Magyar
  • Czech Čeština
  • Products
    • Bryza Steel Gutter Systems
      Features Specification System diagram System elements Installation instructions Go to category
    • Bryza PVC Gutter Systems
      Features Specification System diagram System elements Installation instructions Go to category
    • Soffits Bryza PVC
      Features System elements Installation instructions Go to category
  • About us
  • Download
  • Contact
Home / Gutter systems / Gutter fittings / BRYZA PVC Inner corner any angle 100 mm brown
BRYZA PVC Inner corner any angle 100 mm brown

BRYZA PVC Inner corner any angle 100 mm brown

Product code: 61-252

Description

The element connecting gutters at building corners, enables to fit gutter system to roof shape. Glued with angle given by customer.

Product specifications

EAN

5900805022335

Product code

61-252

Gutter system elements

Inner corner

Angle

Any angle

RAL colour

RAL 8017

System colour

Brown

System type

PVC

Pipe system size

63 mm, 90 mm

Gutter system size

100 mm

System

Gutters

System specification

1An innovative product simplifying the assembly of gutter systems on non-standard roofs. It facilitates the assembly process, does not require gluing, eliminates the need for welding the corners.

Scheme of the system

1ROOF GUTTER

2GUTTER HANGER

3INNER CORNER **

4GUTTER JOINT

5OUTER CORNER ***

6DROP OUTLET

7END CAP (LEFT, RIGHT)

8DOWN PIPE

9T-PIPE

10DOWN PIPE CLAMPING RING

11DOWN PIPE JOINT

12REDUCTION ADAPTER

13RAINWATER RECLAIMER

14ELBOW

15CLEAN-OUT

16SEDIMENT TRAP ((BROWN, GRAPHITE, GREY, BLACK)

17DOWN PIPE CLAMPING RING - METAL

18METAL GUTTER BRACKET (STRAIGHT, TWISTED, ADJUSTABLE)

19FASCIA BRACKET (STRAIGHT, TWISTED)

20CLAMP HOOK / STABILISING FAÇADE FLANGE / DOWN PIPE CLAMP FASTENER FOR COMPOSITE PANELS

Installation instructions

1

CORRECT INSTALLATION A GUARANTEE OF REL IABILITY

When choosing a gutter system, calculate the so-called Effective Roof Area using the formula: EPD = (A+B/2) x C A – horizontal distance from corner to ridge [m] B – roof height (m) C – roof length (m) Minimum installation temperature – 0°C

2

GENERAL PRINCIPLES OF ASSEMBLY

Correct installation of a PVC gutter system is a guarantee of its long- term durability and reliability, even in difficult weather conditions. In comparison with traditional solutions, the main advantage of the
construction is the ability to compensate for thermal changes in the length of its individual elements. This is achieved thanks to the appropriate design of gutter and pipe joints. In gutters, it is implemented through a slidable connection with gutter joints equipped with flexible gaskets, and in downpipes, through assembly slack at the connections with pipe joints. Moreover, elements that fasten the gutter system to the roof and building walls, such as gutter hangers
and down pipe clamping rings, not only stabilize the system but also allow compensation for variations in its length. If gutters are fitted to gutter strips made of galvanised metal sheet, they must be painted or coated. The gutters under the eaves should be installed below the line which is an extension of the roof surface, so that they are not subjected to sliding snow loads.

 

3

CORRECT LOCATION OF GUTTERS UNDER EAVES

Correct installation must protect gutters against the impact of snow sliding down a roof. The upper edge of gutter flanging should not protrude over the extension of the roof surface, which is represented in the picture.

4

CUTTING G 2 UTTERS AND DOWN PIPES

Cut the gutter into suitable length, at the right angle, with a fine-toothed saw.

5

INSTALLATION OF HANGERS

PVC hangers with straight or twisted fascia boards, as well as straight or twisted steel hangers are mounted directly to the laths or rafters. The distance between the hangers should be 40–50 cm. In order to drain water properly, gutters should have a decline in the
direction of the drop outlet of min. 2 mm per 1 m.

6

INSTALLATION OF HOOKS AND CLAMPING RINGS

The first step in the system installation process is to locate an outlet drop, i.e. the lowest element of the system roof section.

7

DETERMINING 5 OF GUTTER DECLINE

At first, mount the hanger located farthest from the drop outlet, and then the hanger next to the drop outlet. Extend two strings between the hangers and establish the correct decline of the gutter. PVC hangers
are mounted directly to the face board.

8

INSTALLATION OF GUTTERS IN HANGERS

In PVC and metal hangers, the installation process should begin with putting the pipe flanging into the front nose of the hanger and then forcing in the internal part of the gutter under the rear nose.

9

INSTALLATION OF DROP OUTLET

A corner, drop outlet and gutter joint should be mounted together by inserting onto the front gutter flanging and latching on the rear gutter flanging. Gutter ends should be situated around 5 mm in front of the limiters.

10

INSTALLATION OF END CAP

Installation of the end cap should start from inserting it into the front gutter flanging and latching it on the rear gutter flanging. Pay attention to the correct position of the gaskets.

11

INSTALLATION OF CLAMPING RINGS

Clamping rings are fixed to a wall using clamp hooks of correct length. If necessary, an additional supporting façade flange is used. Clamping rings on down pipes should be spaced at least every 2–2.5 m.

12

INSTALLATION O 10 F GUTTER JOINT

A corner, drop outlet and gutter joint should be mounted together by inser ting onto the front gutter flanging and latching on the rear gutter flanging. Gutter ends should be situated around 5 mm in front of the limiters. While connecting, pay attention to
a correct position of gaskets located in drop outlets, joints and corners, as well as to the limiters located on internal sur faces of these elements. We also recommend mounting additional gutter hangers on the gutter-gutter joint and gutter- drop outlet
connections.

13

INSTALLATION OF DOWN PIPES

Connect down pipes with drop outlets, elbows and gutter joints using the push-fit system. In case the eaves protrude over 10 cm beyond the wall, the set-off should be extended by a section of a down pipe. Mount the elements in the following order: pipe elbow, pipe, pipe elbow and down pipe. Leave a 10 mm clearance to compensate for thermal expansion of the pipe.

14

INSTALLATION OF DOWN PIPE JOINTS

Connect down pipes using the push-fit system. Leave a 10 mm clearance in a joint socket to compensate for thermal expansion of the pipe.

15

RAINWATER RECLAIMER

We recommend that a reclaimer should be installed in locations not subjected to serious pollution (e.g. tree leaves). In case the reclaimer cleaning is necessary, it should be flushed several times with pressurised water

16

INSTALLATION OF CLEAN-OUT

A clean-out should be mounted on the lower down pipe section when a gutter system is to be connected to a sewer system. Each clean-out comes with a strainer collecting impurities from a gutter. The whole is closed with a tight lid. The passage between a 110 mm diameter clean-out and a 90 mm diameter pipe may be connected using a reduction adapter.

17

INSTALLATION OF SEDIMENT TRAP

A sediment trap should be installed in the ground. It must be flushed with the final soil layer. In order to provide the necessary stability, pour concrete on an excavation bottom and connect the sewage system piping. After the final soil level is established, pour
another layer of concrete around the sediment trap. Next, connect a down pipe.

Bryza Steel Gutter Systems

  • Features
  • Specification
  • System diagram
  • System elements
  • Installation instructions

Bryza PVC Gutter System

  • Features
  • Specification
  • System diagram
  • System elements
  • Installation instructions

Soffit Bryza PVC

  • Features
  • System elements
  • Installation instructions

About us

  • About us

Support

  • Downloads

Information

  • Privacy policy
  • Contact

Our brands

  • Cellfast garden accessories
  • OCEAN gutter systems
  • INES gutter systems

Contact

Cellfast Sp. z o.o.

13 437 47 52

ul. Grabskiego 31

37-450 Stalowa Wola, Poland

Cellfast © 2026. All rights reserved

Design and implementation

Accessibility Toolbar

  • Powered with favoriteLove by Codenroll

This site uses cookies

We use cookies to personalize content and ads, to provide social media features, and to analyze traffic on our website. Information about how you use our website is shared with social, advertising, and analytics partners. Partners may combine this information with other data received from you or collected while using their services.
Necessary
Necessary cookies contribute to the usability of the site by enabling basic functions such as page navigation and access to secure areas of the website. The website cannot function properly without these cookies.
List of cookies
wp-wpml_current_language
Stores the currently selected language of the site by the user.
blocked_cookies
consent_cookies
Statistics
Statistical cookies help website owners understand how different users behave on the site by collecting and reporting anonymous information.
List of cookies
sbjs_current
Tracks the current entry source of the user to the site (e.g., from a search engine, directly).
sbjs_current_add
Completes data about the time and page of the user's entry.
sbjs_first
Records the user's first entry source to the site.
sbjs_first_add
Additional information about the first entry, including URL and referrer.
sbjs_migrations
Stores data about user session migrations between versions of the analytics script.
sbjs_session
Tracks the ongoing user session and visited pages.
sbjs_udata
Collects data about the user's device and browser.
Marketing
Marketing cookies are used to track users on websites. The goal is to display ads that are relevant and interesting to individual users, making them more valuable to publishers and third-party advertisers.
List of cookies
Information about given consent
Allowed cookies
-
Allowed Google Tag options
-
Consent identifier
-
Date of consent given
-
An error occurred while saving preferences.