Cellfast Group Download: product catalogue Zadzwoń: tel. 13 437 47 52
en
  • Polish Polski
  • Hungarian Magyar
  • Czech Čeština
  • Products

    Bryza Steel Gutter Systems

    Features Specification System diagram System elements Installation instructions

    Bryza PVC Gutter Systems

    Features Specification System diagram System elements Installation instructions

    Soffits Bryza PVC

    Features System elements Installation instructions
  • About us
  • Download
  • Contact

Menu

en
  • Polish Polski
  • Hungarian Magyar
  • Czech Čeština
  • Products
    • Bryza Steel Gutter Systems
      Features Specification System diagram System elements Installation instructions Go to category
    • Bryza PVC Gutter Systems
      Features Specification System diagram System elements Installation instructions Go to category
    • Soffits Bryza PVC
      Features System elements Installation instructions Go to category
  • About us
  • Download
  • Contact
Home / Bryza Steel gutter systems / BRYZA STAL Down pipe 90 mm / 4 m black
BRYZA STAL Down pipe 90 mm / 4 m black
BRYZA STAL Down pipe 90 mm / 4 m black
BRYZA STAL Down pipe 90 mm / 4 m black
BRYZA STAL Down pipe 90 mm / 4 m black

BRYZA STAL Down pipe 90 mm / 4 m black

Product code: 64-119

Product specifications

EAN

5907553502645

Product code

64-119

Length

4 m

Gutter system elements

Down pipe

RAL colour

RAL 9005

System colour

Black

System type

STAL

Pipe system size

90 mm

Gutter system size

125 mm

System

Piping

System specification

1STEEL

2GALVANIZED

3PASSIVATION LAYER

4PRIMER

5POLYURETHANE COATING

Scheme of the system

1ROOF GUTTER

2METAL GUTTER BRACKET STRAIGHT

3METAL GUTTER BRACKET TWISTED

4GUTTER HANGER

5DROP OUTLET

6GUTTER JOINT

7INNER CORNER

8UNIVERSAL END CAP

9OUTER CORNER

10DOWN PIPE CLAMPING RING

11DOWN PIPE

12DOWN PIPE CLAMPING RING

13 DOWN PIPE JOINT

14T-PIPE

15CLEAN-OUT

16PIPE ELBOW

17DOWNSPOUT SHOE

18SEDIMENT TRAP / REDUCTIONS

Installation instructions

1

CORRECT INSTALLATION A GUARANTEE OF RELIABILITY

When choosing a gutter system, calculate the so-called Effective Roof Surface using the following formula: ERS = (A+B/2) x C A – horizontal distance from the corner to the roof ridge (m) B – roof heigh [m] C – roof length [m]

2

LOCATION OF GUTTER UNDER EAVES

Correct installation must protect gutters against the impact of snow slid­ing down a roof. The upper edge of gutter flanging should be lowered below the extension of the roof slope surface.

3

GUTTER DECLINE

Extend a string between the highest and the lowest hanger. This helps determine the position of the rest of the hangers. The decline of the gutter towards the drain should be at least 2 mm per 1 m.

4

GUTTER HANGERS

Gutter hangers should be mounted directly to the face board at 60 cm intervals. The first hanger should be placed 10 cm away from the roof edge.

5

RAFTER HOOKS

Rafter hooks should be installed at the maximum spacing of 1 m. The hooks should be distanced from the rafter edge at least 2 cm to allow free ventilation of the roof (Fig. 1.4.).

6

SPACING OF HOOKS

The distance between the rafter hooks and the edge of rafters should be 2 cm, which allows for free ventilation of the roof, especially in difficult winter conditions. Lack of appropriate spacing prevents correct installation of corners.

7

INSTALLATION OF DOWN PIPE AND DROP OUTLET

After installing the hangers, place the gutter in them and mark the position of the drop outlet at the lowest point.

8

LOCATION OF DROP OUTLET

Use a soft pencil to outline the edge of the drop outlet on the surface of the gutter.

9

CUTTING OUT THE DRAIN HOLE

The drain hole must be cut out by using scissors. The use of high-speed tools is not permitted! The diameter of the hole should be reduced by approximately 2,5 cm in relation to the previously marked edge of the drop outlet.

10

EDGE PROCESSING

Profile the cut edge on the inside of the gutter using suitable tools that do not damage the gutter coating, e.g. a soft faced hammer.

11

INSTALLATION OF DROP OUTLET

Stability of the drop outlet is ensured by four mounting elements, the so-called leaves, which must be bent deep into the gutter flanging.

12

GUTTER JOINTS

After latching the gutter joint on the rear flanging of the connected elemets, the joint with a gasket must be tightened and pressed from underneath. Only after pressing can the clamp be latched onto the front flanging and locked in place by bending the leaves.

13

CORNERS

Connect corners to the gutters with gutter joints. It is necessary to use additional gutter hangers to stabilise the system. In order to ensure proper dilatation of the system, leave a 5 mm gap at the connection between the corner and the gutter. Mount the additional gutter hangers maximum 15 cm from the centre of the gutter joint.

14

INSTALLATION OF GUTTER HANGERS AND CLUMPS

The first step is to drill a hole in the wall. We recommend using a stabilising flange. Screw the back part of the clamping ring with an appropriate thread onto the screwed hook.

15

VERTICALISATION OF DOWN PIPE

Always use a spanner for screwing in or unscrewing the clamping ring when verticalisation of the down pipe.

16

INSTALLATION OF DOWN PIPE CLAMPING RINGS

After screwing on the back part of the clamping ring, push the front part into the socket and screwed tight. Down pipe clamping rings should be installed at least every 2 m.

17

CONNECTION OF DOWN PIPES

Down pipes have a socket end (fig. 6.1). In case of a pipe with a cut off end, use a pipe joint (Fig. 6.2).

18

INSTALLATION OF DOWNSPOUT SHOE

The downspout shoe should be installed min. 5 cm above the ground surface. There can also be used a sediment trap from the BRYZA PVC gutter system.

19

INSTALLATION OF PVC SEDIMENT TRAP

Install the sediment trap in the ground, making sure to flush it with the final ground surface. In order to provide the necessary stability, pour concrete on an excavation bottom and connect the sewage system piping. After establishing the final ground level, pour another layer of concrete around the sediment trap. Then connect the down pipe.

Bryza Steel Gutter Systems

  • Features
  • Specification
  • System diagram
  • System elements
  • Installation instructions

Bryza PVC Gutter System

  • Features
  • Specification
  • System diagram
  • System elements
  • Installation instructions

Soffit Bryza PVC

  • Features
  • System elements
  • Installation instructions

About us

  • About us

Support

  • Downloads

Information

  • Privacy policy
  • Contact

Our brands

  • Cellfast garden accessories
  • OCEAN gutter systems
  • INES gutter systems

Contact

Cellfast Sp. z o.o.

13 437 47 52

ul. Grabskiego 31

37-450 Stalowa Wola, Poland

Cellfast © 2026. All rights reserved

Design and implementation

Accessibility Toolbar

  • Powered with favoriteLove by Codenroll

This site uses cookies

We use cookies to personalize content and ads, to provide social media features, and to analyze traffic on our website. Information about how you use our website is shared with social, advertising, and analytics partners. Partners may combine this information with other data received from you or collected while using their services.
Necessary
Necessary cookies contribute to the usability of the site by enabling basic functions such as page navigation and access to secure areas of the website. The website cannot function properly without these cookies.
List of cookies
wp-wpml_current_language
Stores the currently selected language of the site by the user.
blocked_cookies
consent_cookies
Statistics
Statistical cookies help website owners understand how different users behave on the site by collecting and reporting anonymous information.
List of cookies
sbjs_current
Tracks the current entry source of the user to the site (e.g., from a search engine, directly).
sbjs_current_add
Completes data about the time and page of the user's entry.
sbjs_first
Records the user's first entry source to the site.
sbjs_first_add
Additional information about the first entry, including URL and referrer.
sbjs_migrations
Stores data about user session migrations between versions of the analytics script.
sbjs_session
Tracks the ongoing user session and visited pages.
sbjs_udata
Collects data about the user's device and browser.
Marketing
Marketing cookies are used to track users on websites. The goal is to display ads that are relevant and interesting to individual users, making them more valuable to publishers and third-party advertisers.
List of cookies
Information about given consent
Allowed cookies
-
Allowed Google Tag options
-
Consent identifier
-
Date of consent given
-
An error occurred while saving preferences.